ProcurDiscover
🇨🇴Colombia · ANIConsultoría

DIAGNOSIS OF EL PINTAO BRIDGE

Reference: VJ-VEJ-MC-005-2026

Estimated value

COL$138.5M

≈ $35K

Closing

May 15, 2026

Published

May 7, 2026

Category

vehicles-fleet

Description

To contract the preparation of the pathological study of the vehicular bridge located over the El Pintao stream, on Calle 38 in the municipality of Sincelejo (Sucre), urban passage, and, based on the results of said diagnosis, to develop the studies and designs recommended thereby, whether for the intervention of the existing structure or for the comprehensive formulation of the designs required for the construction of a new bridge, as applicable.

Track this opportunity →View on source portal ↗

Want the full picture?

Procur Pro unlocks compliance matrix, requirements analysis, AI-drafted proposal outline, team collaboration, and Word export for this tender.

Try Procur Pro →
Share:LinkedInEmail