EXECUTION AT FIXED UNIT PRICE WITHOUT PRICE ADJUSTMENT FORMULA FOR THE CONSTRUCTION; DEMOLITION; DISMANTLING; ADAPTATION AND FULL-COST REPLACEMENT OF THE PORT INFRASTRUCTURES OF THE NATIONAL NAVY; CONT
Reference: 0003-ARC-JOLAN-2026
Estimated value
COL$74.7B
≈ $18.7M
Closing
Aug 5, 2026
in 13 days
Published
Jun 16, 2026
Category
—
Description
TO CONTRACT THE EXECUTION AT FIXED UNIT PRICE WITHOUT PRICE ADJUSTMENT FORMULA FOR THE CONSTRUCTION, DEMOLITION, DISMANTLING, ADAPTATION AND FULL-COST REPLACEMENT OF THE PORT INFRASTRUCTURES OF THE NATIONAL NAVY, CORRESPONDING TO: LOT 1: DEMOLITION OF THE EXISTING PIER AND CONSTRUCTION OF A SHELTERED BASIN AND FLOATING DOCK AT THE SANTA MARTA COAST GUARD STATION (MAGDALENA), LOT 2: DISMANTLING, ADAPTATION AND FULL-COST REPLACEMENT OF THE PIER AT THE BUENAVENTURA COAST GUARD STATION (VA
Want the full picture?
Procur Pro unlocks compliance matrix, requirements analysis, AI-drafted proposal outline, team collaboration, and Word export for this tender.
Try Procur Pro →