🇨🇴Colombia · MUNICIPIO DE CUBARA BOYACAObra
WORKS FOR FLOOD PREVENTION AND CONTROL THROUGH THE SUPPLY AND INSTALLATION OF CONCRETE HEXAPODS FOR THE PROTECTION OF THE RIGHT BANK OF THE LA GAITANA STREAM; MUNICIPALITY OF CUBARÁ;
Reference: SAMC-003-2026 (Manifestación de interés (Menor Cuantía)) (Presentación de oferta)
Estimated value
COL$259.2M
≈ $65K
Closing
May 8, 2026
Published
May 6, 2026
Category
—
Description
WORKS FOR FLOOD PREVENTION AND CONTROL THROUGH THE SUPPLY AND INSTALLATION OF CONCRETE HEXAPODS FOR THE PROTECTION OF THE RIGHT BANK OF THE LA GAITANA STREAM, MUNICIPALITY OF CUBARÁ, BOYACÁ
Want the full picture?
Procur Pro unlocks compliance matrix, requirements analysis, AI-drafted proposal outline, team collaboration, and Word export for this tender.
Try Procur Pro →