ProcurDiscover
🇪🇺European Union · Movar IksNorwayneg-w-call

Norway – Building installation work – E1 Electro

Reference: 275848-2026

Estimated value

Closing

Discovered

Apr 28, 2026

first seen on this date

Category

petroleum-fuels

Description

This procurement, E1 Electro, is one of several contracts in a larger project that MOVAR has for Nye Fuglevik Treatment Facility. This contract is for the delivery of electrical installations at the plant and is an execution contract based on NS8405. The contract includes the following activities: • The existing installations shall be disassembled and removed. • Installations are with main distribution boards and boards/distributions for building installations and process. • Constructional installations are conducive paths, earthing, lightning conductor installations, lights, electrical outlets, fire alarm systems, cabling for access control, burglar alarms and communication. • Cables shall be laid for the process and HVAC and sanitation, cables shall be laid for engines, instrumentation and frequency transformers for engines shall be delivered. Some instrumentation shall be provided. • The switch-off system is to be assembled in the board room. • Solar panel installations shall be installed on approx. half the roof area.

Track this opportunity →View on source portal ↗

Want the full picture?

Procur Pro unlocks compliance matrix, requirements analysis, AI-drafted proposal outline, team collaboration, and Word export for this tender.

Try Procur Pro →
Share:LinkedInEmail