ProcurDiscover

Opportunities

163 active tenders across 31 jurisdictions.

EUIreland
Closes in 10 days

Ireland – Installation of traffic lights – FCC/320/25 Establishment of a Single-Supplier Framework Agreement for Traffic Control Equipment Maintenance and Emergency General Works, including an Initial Contract of 12 months for Fingal Co Co

Establishment of a Single-Supplier Framework Agreement for Traffic Control Equipment Maintenance and Emergency General Works, including an Initial Contract of 12 months for Fingal Co Co

Fingal County Council_371 · 450430-2026
€9.0M
$9.7M
EUIreland
Closes in 82 months

Ireland – Miscellaneous spare parts – Annual Readvertisement of Qualification System for Bus Éireann Vehicle Spare Parts Qualification Panel - (Annual Readvertisement Publication Number 2/8)

Bus Éireann/Irish Bus proposes establishing a Vehicle Spare Parts Qualification panels of potential suppliers which will be maintained for a period of eight (8) years from the date of establishment for their fleet of Buses and Coaches, unless terminated earlier by the Contracting Authority. The Qualification Panels will be established in respect to different parts categories as set out below. Applicants may apply for one or more Panels. Panel 1 - Supply of, Repair and Maintenance for Body Parts Panel 2 - Supply of Parts, Repair and Maintenance of Chassis Panel 3 - Supply of Parts, Repair and Maintenance of Body Panels and Structure Panel 4 - The Supply of Parts, Repair and Maintenance of Glazing Panel 5 - The Supply of Parts, Repair and Maintenance of Heating, Ventilation and Air Conditioning Systems 6 - The Supply of, Repair and Maintenance of Hoses and Pipes Panel 7 - The Supply of, Repair and Maintenance of Exterior and Interior Fittings 8 - The Supply of, Repair and Maintenance of Ancillary Onboard equipment 9 - The Supply of Wheel Rims Panel 10 - The Supply of Parts, Repairs and Maintenance of Braking Systems 11 – The Supply of Suspension and Steering Systems Panel 12 - The Supply of, Repair and Maintenance for General Driveline Systems Panel 13 The Supply of Filters Panel Panel 14 - The Supply of, Repair and Maintenance of Electrical and Electronic Components. Successful applicants will form part of the Qualification Panel. Being on the Qualification Panel does not give the supplier any guarantee of work but may enable the supplier to tender for framework agreements, and contracts for individual projects, to be set up through the Qualification Panel from time to time. When a competition for a particular framework agreement or contract from the Qualification Panel is required, registered applicants may be taken through a further pre-qualification process to determine those to be invited to tender or negotiate. Turnover will be used to determine which Panel member(s) will be invited to tender based on the overall value of the framework agreement or contract. When determining which companies will be invited to tender, only those with a turnover of twice the annual value of the contract will be invited. Applicants who have been deemed suitably qualified may be invited to submit a formal tender for the requirements that arise during the Qualification Panel term. This Notice does not prevent the Contracting Authority from issuing other contract notices for specific requirements from time to time, including procurements outside the Qualification Panel for requirements falling within the scope of the Qualification Panel. After the initial advertisement, the panel must be advertised annually for the duration of the panel (8 years) to continually inform the market place of its existence. Economic Operators can apply to qualify on to the panel, throughout the duration of the panel. Economic Operators who are already qualified to the panel can also amend their application at any interval should their financial or technical capacity or capability change. (Annual Re-publication Number 2/8)

Bus Eireann/Irish Bus · 322660-2026
EUIreland

Ireland – Installation of signalling equipment – Intelligent Transport Systems Equipment Frameworks Generation 2

Transport Infrastructure Ireland (TII) has a requirement to establish nine framework lots under the TII492 Intelligent Transport Systems Equipment Frameworks Generation 2 programme. Lots 1, 2 and 3A to 3F will support TII’s ITS equipment requirements, while Lot 4 will establish a framework to support local authorities in delivering Periodic School Limit signage in accordance with a Government directive. The proposed framework term is four years. The estimated maximum value is €27 million for Lots 1, 2 and 3A to 3F, and €48 million for Lot 4, giving a total estimated maximum value of €75 million across all lots. Lots 1 – 3A to 3F (TII’s requirement for ITS equipment) Transport Infrastructure Ireland (TII) operates and maintains a network of roadside Intelligent Transport Systems (ITS) equipment linked to the Motorway Operations Control Centre (MOCC) in Dublin Tunnel. This infrastructure supports the safe and efficient operation of the national road network. The ITS Equipment Framework will provide the contractual mechanism through which TII may procure ITS equipment, installation services and associated civil works required to maintain, renew and expand the network. Lot 4 (Department of Transport and local authorities requirement for ITS Equipment) A Government directive requires local authorities to install Periodic School Limit (PSL) signs at schools nationwide. Following engagement with the Department of Transport, Lot 4 has been included to establish a framework agreement through which local authorities may procure these works. TII’s role will be limited to establishing the framework agreement and overseeing the eTenders system and monitoring framework ceiling limits. Local authorities will conduct mini-competitions and fund the resulting call-off contracts. TII does not currently expect to use Lot 4 directly, but will retain the option to do so if required. Transport Infrastructure Ireland (TII) has a requirement to establish nine framework lots under the TII492 Intelligent Transport Systems Equipment Frameworks Generation 2 programme. Lots 1, 2 and 3A to 3F will support TII’s ITS equipment requirements, while Lot 4 will establish a framework to support local authorities in delivering Periodic School Limit signage in accordance with a Government directive. The proposed framework term is four years. The estimated maximum value is €27 million for Lots 1, 2 and 3A to 3F, and €48 million for Lot 4, giving a total estimated maximum value of €75 million across all lots. Lots 1 – 3A to 3F (TII’s requirement for ITS equipment) Transport Infrastructure Ireland (TII) operates and maintains a network of roadside Intelligent Transport Systems (ITS) equipment linked to the Motorway Operations Control Centre (MOCC) in Dublin Tunnel. This infrastructure supports the safe and efficient operation of the national road network. The ITS Equipment Framework will provide the contractual mechanism through which TII may procure ITS equipment, installation services and associated civil works required to maintain, renew and expand the network. Lot 4 (Department of Transport and local authorities requirement for ITS Equipment) A Government directive requires local authorities to install Periodic School Limit (PSL) signs at schools nationwide. Following engagement with the Department of Transport, Lot 4 has been included to establish a framework agreement through which local authorities may procure these works. TII’s role will be limited to establishing the framework agreement and overseeing the eTenders system and monitoring framework ceiling limits. Local authorities will conduct mini-competitions and fund the resulting call-off contracts. TII does not currently expect to use Lot 4 directly, but will retain the option to do so if required. Transport Infrastructure Ireland (TII) has a requirement to establish nine framework lots under the TII492 Intelligent Transport Systems Equipment Frameworks Generation 2 programme. Lots 1, 2 and 3A to 3F will support TII’s ITS equipment requirements, while Lot 4 will establish a framework to support local authorities in delivering Periodic School Limit signage in accordance with a Government directive. The proposed framework term is four years. The estimated maximum value is €27 million for Lots 1, 2 and 3A to 3F, and €48 million for Lot 4, giving a total estimated maximum value of €75 million across all lots. Lots 1 – 3A to 3F (TII’s requirement for ITS equipment) Transport Infrastructure Ireland (TII) operates and maintains a network of roadside Intelligent Transport Systems (ITS) equipment linked to the Motorway Operations Control Centre (MOCC) in Dublin Tunnel. This infrastructure supports the safe and efficient operation of the national road network. The ITS Equipment Framework will provide the contractual mechanism through which TII may procure ITS equipment, installation services and associated civil works required to maintain, renew and expand the network. Lot 4 (Department of Transport and local authorities requirement for ITS Equipment) A Government directive requires local authorities to install Periodic School Limit (PSL) signs at schools nationwide. Following engagement with the Department of Transport, Lot 4 has been included to establish a framework agreement through which local authorities may procure these works. TII’s role will be limited to establishing the framework agreement and overseeing the eTenders system and monitoring framework ceiling limits. Local authorities will conduct mini-competitions and fund the resulting call-off contracts. TII does not currently expect to use Lot 4 directly, but will retain the option to do so if required. Transport Infrastructure Ireland (TII) has a requirement to establish nine framework lots under the TII492 Intelligent Transport Systems Equipment Frameworks Generation 2 programme. Lots 1, 2 and 3A to 3F will support TII’s ITS equipment requirements, while Lot 4 will establish a framework to support local authorities in delivering Periodic School Limit signage in accordance with a Government directive. The proposed framework term is four years. The estimated maximum value is €27 million for Lots 1, 2 and 3A to 3F, and €48 million for Lot 4, giving a total estimated maximum value of €75 million across all lots. Lots 1 – 3A to 3F (TII’s requirement for ITS equipment) Transport Infrastructure Ireland (TII) operates and maintains a network of roadside Intelligent Transport Systems (ITS) equipment linked to the Motorway Operations Control Centre (MOCC) in Dublin Tunnel. This infrastructure supports the safe and efficient operation of the national road network. The ITS Equipment Framework will provide the contractual mechanism through which TII may procure ITS equipment, installation services and associated civil works required to maintain, renew and expand the network. Lot 4 (Department of Transport and local authorities requirement for ITS Equipment) A Government directive requires local authorities to install Periodic School Limit (PSL) signs at schools nationwide. Following engagement with the Department of Transport, Lot 4 has been included to establish a framework agreement through which local authorities may procure these works. TII’s role will be limited to establishing the framework agreement and overseeing the eTenders system and monitoring framework ceiling limits. Local authorities will conduct mini-competitions and fund the resulting call-off contracts. TII does not currently expect to use Lot 4 directly, but will retain the option to do so if required. Transport Infrastructure Ireland (TII) has a requirement to establish nine framework lots under the TII492 Intelligent Transport Systems Equipment Frameworks Generation 2 programme. Lots 1, 2 and 3A to 3F will support TII’s ITS equipment requirements, while Lot 4 will establish a framework to support local authorities in delivering Periodic School Limit signage in accordance with a Government directive. The proposed framework term is four years. The estimated maximum value is €27 million for Lots 1, 2 and 3A to 3F, and €48 million for Lot 4, giving a total estimated maximum value of €75 million across all lots. Lots 1 – 3A to 3F (TII’s requirement for ITS equipment) Transport Infrastructure Ireland (TII) operates and maintains a network of roadside Intelligent Transport Systems (ITS) equipment linked to the Motorway Operations Control Centre (MOCC) in Dublin Tunnel. This infrastructure supports the safe and efficient operation of the national road network. The ITS Equipment Framework will provide the contractual mechanism through which TII may procure ITS equipment, installation services and associated civil works required to maintain, renew and expand the network. Lot 4 (Department of Transport and local authorities requirement for ITS Equipment) A Government directive requires local authorities to install Periodic School Limit (PSL) signs at schools nationwide. Following engagement with the Department of Transport, Lot 4 has been included to establish a framework agreement through which local authorities may procure these works. TII’s role will be limited to establishing the framework agreement and overseeing the eTenders system and monitoring framework ceiling limits. Local authorities will conduct mini-competitions and fund the resulting call-off contracts. TII does not currently expect to use Lot 4 directly, but will retain the option to do so if required. Transport Infrastructure Ireland (TII) has a requirement to establish nine framework lots under the TII492 Intelligent Transport Systems Equipment Frameworks Generation 2 programme. Lots 1, 2 and 3A to 3F will support TII’s ITS equipment requirements, while Lot 4 will establish a framework to support local authorities in delivering Periodic School Limit signage in accordance with a Government directive. The proposed framework term is four years. The estimated maximum value is €27 million for Lots 1, 2 and 3A to 3F, and €48 million for Lot 4, giving a total estimated maximum value of €75 million across all lots. Lots 1 – 3A to 3F (TII’s requirement for ITS equipment) Transport Infrastructure Ireland (TII) operates and maintains a network of roadside Intelligent Transport Systems (ITS) equipment linked to the Motorway Operations Control Centre (MOCC) in Dublin Tunnel. This infrastructure supports the safe and efficient operation of the national road network. The ITS Equipment Framework will provide the contractual mechanism through which TII may procure ITS equipment, installation services and associated civil works required to maintain, renew and expand the network. Lot 4 (Department of Transport and local authorities requirement for ITS Equipment) A Government directive requires local authorities to install Periodic School Limit (PSL) signs at schools nationwide. Following engagement with the Department of Transport, Lot 4 has been included to establish a framework agreement through which local authorities may procure these works. TII’s role will be limited to establishing the framework agreement and overseeing the eTenders system and monitoring framework ceiling limits. Local authorities will conduct mini-competitions and fund the resulting call-off contracts. TII does not currently expect to use Lot 4 directly, but will retain the option to do so if required. Transport Infrastructure Ireland (TII) has a requirement to establish nine framework lots under the TII492 Intelligent Transport Systems Equipment Frameworks Generation 2 programme. Lots 1, 2 and 3A to 3F will support TII’s ITS equipment requirements, while Lot 4 will establish a framework to support local authorities in delivering Periodic School Limit signage in accordance with a Government directive. The proposed framework term is four years. The estimated maximum value is €27 million for Lots 1, 2 and 3A to 3F, and €48 million for Lot 4, giving a total estimated maximum value of €75 million across all lots. Lots 1 – 3A to 3F (TII’s requirement for ITS equipment) Transport Infrastructure Ireland (TII) operates and maintains a network of roadside Intelligent Transport Systems (ITS) equipment linked to the Motorway Operations Control Centre (MOCC) in Dublin Tunnel. This infrastructure supports the safe and efficient operation of the national road network. The ITS Equipment Framework will provide the contractual mechanism through which TII may procure ITS equipment, installation services and associated civil works required to maintain, renew and expand the network. Lot 4 (Department of Transport and local authorities requirement for ITS Equipment) A Government directive requires local authorities to install Periodic School Limit (PSL) signs at schools nationwide. Following engagement with the Department of Transport, Lot 4 has been included to establish a framework agreement through which local authorities may procure these works. TII’s role will be limited to establishing the framework agreement and overseeing the eTenders system and monitoring framework ceiling limits. Local authorities will conduct mini-competitions and fund the resulting call-off contracts. TII does not currently expect to use Lot 4 directly, but will retain the option to do so if required. Transport Infrastructure Ireland (TII) has a requirement to establish nine framework lots under the TII492 Intelligent Transport Systems Equipment Frameworks Generation 2 programme. Lots 1, 2 and 3A to 3F will support TII’s ITS equipment requirements, while Lot 4 will establish a framework to support local authorities in delivering Periodic School Limit signage in accordance with a Government directive. The proposed framework term is four years. The estimated maximum value is €27 million for Lots 1, 2 and 3A to 3F, and €48 million for Lot 4, giving a total estimated maximum value of €75 million across all lots. Lots 1 – 3A to 3F (TII’s requirement for ITS equipment) Transport Infrastructure Ireland (TII) operates and maintains a network of roadside Intelligent Transport Systems (ITS) equipment linked to the Motorway Operations Control Centre (MOCC) in Dublin Tunnel. This infrastructure supports the safe and efficient operation of the national road network. The ITS Equipment Framework will provide the contractual mechanism through which TII may procure ITS equipment, installation services and associated civil works required to maintain, renew and expand the network. Lot 4 (Department of Transport and local authorities requirement for ITS Equipment) A Government directive requires local authorities to install Periodic School Limit (PSL) signs at schools nationwide. Following engagement with the Department of Transport, Lot 4 has been included to establish a framework agreement through which local authorities may procure these works. TII’s role will be limited to establishing the framework agreement and overseeing the eTenders system and monitoring framework ceiling limits. Local authorities will conduct mini-competitions and fund the resulting call-off contracts. TII does not currently expect to use Lot 4 directly, but will retain the option to do so if required. Transport Infrastructure Ireland (TII) has a requirement to establish nine framework lots under the TII492 Intelligent Transport Systems Equipment Frameworks Generation 2 programme. Lots 1, 2 and 3A to 3F will support TII’s ITS equipment requirements, while Lot 4 will establish a framework to support local authorities in delivering Periodic School Limit signage in accordance with a Government directive. The proposed framework term is four years. The estimated maximum value is €27 million for Lots 1, 2 and 3A to 3F, and €48 million for Lot 4, giving a total estimated maximum value of €75 million across all lots. Lots 1 – 3A to 3F (TII’s requirement for ITS equipment) Transport Infrastructure Ireland (TII) operates and maintains a network of roadside Intelligent Transport Systems (ITS) equipment linked to the Motorway Operations Control Centre (MOCC) in Dublin Tunnel. This infrastructure supports the safe and efficient operation of the national road network. The ITS Equipment Framework will provide the contractual mechanism through which TII may procure ITS equipment, installation services and associated civil works required to maintain, renew and expand the network. Lot 4 (Department of Transport and local authorities requirement for ITS Equipment) A Government directive requires local authorities to install Periodic School Limit (PSL) signs at schools nationwide. Following engagement with the Department of Transport, Lot 4 has been included to establish a framework agreement through which local authorities may procure these works. TII’s role will be limited to establishing the framework agreement and overseeing the eTenders system and monitoring framework ceiling limits. Local authorities will conduct mini-competitions and fund the resulting call-off contracts. TII does not currently expect to use Lot 4 directly, but will retain the option to do so if required.

Transport Infrastructure Ireland (TII) · 480418-2026
€42.7M
$46.1M
EUIreland

Ireland – Electrical machinery, apparatus, equipment and consumables; lighting – 9226 ICR Head, Tail and Marker Light

IÉ wishes to procure 252 combined LED units (headlight with dim/full beam, marker, and taillight) and 126 upper marker-only units for the 22000 ICR Fleet. Units must comply with EN 15153-1:2020 and EN 50155, be installable without vehicle modification, and include adaptor plates if needed. Suppliers must provide two cabs’ worth of units for fitment and one-month dynamic testing before full rollout. Units will be delivered to Laois Traincare Depot. Packaging must allow for one year of dry storage. A 12-month warranty and Certificate of Conformance are required.

Iarnród Eireann-Irish Rail · 286639-2026
€266K
$287K
EUIreland

Ireland – Buses and coaches – Annual Readvertisement of Qualification System for the Purchase and or Leasing of Buses and Coaches for Bus Éireann/Irish Bus - (Annual Readvertisement Publication Number 2/8)

Bus Éireann intends to procure low emission coaches and schools buses, and where possible zero-emission coaches with low environmental impact in compliance with the latest EURO VI Regulation. The vehicles will comply, as appropriate, with the EPA’s guidelines on road transport vehicles and the European Communities (Clean and Energy Efficient Road Transport Vehicles) (Amendment) Regulations 2021. To be considered for inclusion on a Qualification Panel(s), applicants must complete the Pre-Qualification Questionnaire (PQQ) providing relevant details in relation to the criteria set out below for assessment. It is envisaged that this qualification system will be used to either purchase and or lease during the five-year term of the Qualification System. Economic operators apply once to qualify onto the panel by providing details of their financial and technical capacity against predefined published Selection Criteria within a PQQ. The Qualification Panel for the Purchase and or Lease of Buses and Coaches will be broken down in to sub categories called Lot 1 – Purchase of Buses and Coaches, and Lot 2 – Lease of Buses and Coaches. Economic operators can apply for the Lot(s) that best reflect their commercial operations. Economic operators must complete a PQQ for the Lot(s) that they wish to qualify to. Only economic operators who satisfy the selection criteria of each individual Lot will qualify on to that Lot. After the initial advertisement, the panel must be advertised annually for the duration of the panel (5 years) to continually inform the market place of its existence. Economic Operators can apply to qualify on to the panel, throughout the duration of the panel. Economic Operators who are already qualified to the panel can also amend their application at any interval should their financial or technical capacity or capability change. Qualifying onto a panel does not guarantee any work and/or contracts to a supplier. There is no obligation to use the Qualification Panel and contracts can be advertised on an individual basis using the Negotiated Procedure. (Annual Republication Number 2/8) Bus Éireann intends to procure low emission coaches and schools buses, and where possible zero-emission coaches with low environmental impact in compliance with the latest EURO VI Regulation. The vehicles will comply, as appropriate, with the EPA’s guidelines on road transport vehicles and the European Communities (Clean and Energy Efficient Road Transport Vehicles) (Amendment) Regulations 2021. To be considered for inclusion on a Qualification Panel(s), applicants must complete the Pre-Qualification Questionnaire (PQQ) providing relevant details in relation to the criteria set out below for assessment. It is envisaged that this qualification system will be used to either purchase and or lease during the five-year term of the Qualification System. Economic operators apply once to qualify onto the panel by providing details of their financial and technical capacity against predefined published Selection Criteria within a PQQ. The Qualification Panel for the Purchase and or Lease of Buses and Coaches will be broken down in to sub categories called Lot 1 – Purchase of Buses and Coaches, and Lot 2 – Lease of Buses and Coaches. Economic operators can apply for the Lot(s) that best reflect their commercial operations. Economic operators must complete a PQQ for the Lot(s) that they wish to qualify to. Only economic operators who satisfy the selection criteria of each individual Lot will qualify on to that Lot. After the initial advertisement, the panel must be advertised annually for the duration of the panel (5 years) to continually inform the market place of its existence. Economic Operators can apply to qualify on to the panel, throughout the duration of the panel. Economic Operators who are already qualified to the panel can also amend their application at any interval should their financial or technical capacity or capability change. Qualifying onto a panel does not guarantee any work and/or contracts to a supplier. There is no obligation to use the Qualification Panel and contracts can be advertised on an individual basis using the Negotiated Procedure. (Annual Republication Number 2/8) Bus Éireann intends to procure low emission coaches and schools buses, and where possible zero-emission coaches with low environmental impact in compliance with the latest EURO VI Regulation. The vehicles will comply, as appropriate, with the EPA’s guidelines on road transport vehicles and the European Communities (Clean and Energy Efficient Road Transport Vehicles) (Amendment) Regulations 2021. To be considered for inclusion on a Qualification Panel(s), applicants must complete the Pre-Qualification Questionnaire (PQQ) providing relevant details in relation to the criteria set out below for assessment. It is envisaged that this qualification system will be used to either purchase and or lease during the five-year term of the Qualification System. Economic operators apply once to qualify onto the panel by providing details of their financial and technical capacity against predefined published Selection Criteria within a PQQ. The Qualification Panel for the Purchase and or Lease of Buses and Coaches will be broken down in to sub categories called Lot 1 – Purchase of Buses and Coaches, and Lot 2 – Lease of Buses and Coaches. Economic operators can apply for the Lot(s) that best reflect their commercial operations. Economic operators must complete a PQQ for the Lot(s) that they wish to qualify to. Only economic operators who satisfy the selection criteria of each individual Lot will qualify on to that Lot. After the initial advertisement, the panel must be advertised annually for the duration of the panel (5 years) to continually inform the market place of its existence. Economic Operators can apply to qualify on to the panel, throughout the duration of the panel. Economic Operators who are already qualified to the panel can also amend their application at any interval should their financial or technical capacity or capability change. Qualifying onto a panel does not guarantee any work and/or contracts to a supplier. There is no obligation to use the Qualification Panel and contracts can be advertised on an individual basis using the Negotiated Procedure. (Annual Republication Number 2/8) Bus Éireann intends to procure low emission coaches and schools buses, and where possible zero-emission coaches with low environmental impact in compliance with the latest EURO VI Regulation. The vehicles will comply, as appropriate, with the EPA’s guidelines on road transport vehicles and the European Communities (Clean and Energy Efficient Road Transport Vehicles) (Amendment) Regulations 2021. To be considered for inclusion on a Qualification Panel(s), applicants must complete the Pre-Qualification Questionnaire (PQQ) providing relevant details in relation to the criteria set out below for assessment. It is envisaged that this qualification system will be used to either purchase and or lease during the five-year term of the Qualification System. Economic operators apply once to qualify onto the panel by providing details of their financial and technical capacity against predefined published Selection Criteria within a PQQ. The Qualification Panel for the Purchase and or Lease of Buses and Coaches will be broken down in to sub categories called Lot 1 – Purchase of Buses and Coaches, and Lot 2 – Lease of Buses and Coaches. Economic operators can apply for the Lot(s) that best reflect their commercial operations. Economic operators must complete a PQQ for the Lot(s) that they wish to qualify to. Only economic operators who satisfy the selection criteria of each individual Lot will qualify on to that Lot. After the initial advertisement, the panel must be advertised annually for the duration of the panel (5 years) to continually inform the market place of its existence. Economic Operators can apply to qualify on to the panel, throughout the duration of the panel. Economic Operators who are already qualified to the panel can also amend their application at any interval should their financial or technical capacity or capability change. Qualifying onto a panel does not guarantee any work and/or contracts to a supplier. There is no obligation to use the Qualification Panel and contracts can be advertised on an individual basis using the Negotiated Procedure. (Annual Republication Number 2/8)

Bus Eireann/Irish Bus · 299631-2026
€120.0M
$129.6M
EUIreland

Ireland – Installation of road signs – Safe Routes to School Round 3 Signs and lines High speed rural roads North Sligo at Calry National School and St. Aidans National School

The Works will consist of but not limited to the following elements: Site Clearance. School Zone elements - colour surfacing applied within school zone, lines. School Ahead Signs with flashing amber beacons and colourful poles. Associated works including line marking and signage. Road markings along the length of the scheme. Provision of Road signage. Traffic Management.

Sligo County Council · 282777-2026
EUIreland

Ireland – Crane and dumper trucks – CM 10/25 - EUJTF Midlands Trail Network - Supply of Tracked Dumpers

The supplies comprises of the supply and delivery of tracked dumpers suitable for use on soft ground, peatlands, and restricted-access sites. The supplies comprises of the supply and delivery of tracked dumpers suitable for use on soft ground, peatlands, and restricted-access sites. The supplies comprises of the supply and delivery of tracked dumpers suitable for use on soft ground, peatlands, and restricted-access sites. The supplies comprises of the supply and delivery of tracked dumpers suitable for use on soft ground, peatlands, and restricted-access sites. Please note Lot 4 was cancelled.

Bord na Móna PLC · 280430-2026
€216K
$233K
EUIreland

Ireland – Trailers – Supply of Box Van Trailers to the Defence Forces

Minister for Defence Ireland has a requirement for the Supply and Delivery to the Department of Defence (Defence Forces), of Box Van Trailers as per specifications. The requirement is for initial purchase of ten (10) x Two-Axle Box Van type trailers with ramp doors.. The trailers will have maximum maneuverability for the loading and unloading of equipment in restricted areas. The trailer must be for use with a Toyota Landcruiser 2.8 L LWB YOM 2020 with NATO type tow hitch.

Irish Defence Forces_1144 · 270652-2026
€140K
$151K
EUIreland

Ireland – Parts and accessories for vehicles and their engines – DLR Co Co - SPFA for Supply of Motor Vehicle Parts to Dun Laoghaire Rathdown County Council

Dun Laoghaire Rathdown County Council (Mechanical Section) has a road-going fleet of approximately 199 vehicles (3.5-7.5T pickups, 10-26T tipper trucks, 18-32T Jetvac trucks, car vans, large panel vans, light duty commercial type vans, jeeps, EV’s, 4WD utility vehicles etc. The majority of the service and maintenance conducted on the fleet is carried out in-house at the Mechanical Sections workshop located at Ballyogan Depot. This purpose of this contract is to provide for contracts for providing parts to the above items when they are serviced/repaired in-house by DLRCC maintenance staff.

Dun Laoghaire-Rathdown County Council · 270155-2026
€700K
$756K
EUIreland

Ireland – Demolition, site preparation and clearance work – Improvement Works to Properties 9,10 and 11 St Mary's Terrace and Old Council Depot, Athlone, Co.Westmeath

Westmeath County Council (WCC) is progressing external improvement works to houses 9, 10 and 11 St Mary’s Terrace, Athlone County Westmeath with the intention of making these buildings safe and improve the aesthetic impact of the houses on the surrounding streetscape. The works will involve the removal of fire damaged roofs of houses 9 and 10 including asbestos slates and roof timbers. The damaged sections of the roof of house no. 11 are to be reinstated to make it weatherproof and prevent further deterioration of the house in the medium term. All windows and doors of the 3 no houses to be blocked up as detailed. All rubbish is to be removed from the external lower ground level areas front, back and side of the three houses. Consideration is to be given to the presence of Japanese Knotweed to the back of the properties and while not part of these works an exclusion zone will be required to be set up to exclude access to this area. As these houses are in a residential area safe access is to be maintained to neighboring properties throughout the duration of the works. WCC is also progressing the fitting of a new palisade gate and fence section to the yard of the old Council Depot at Loughanaskin, Athlone, Co. Westmeath and the general cleanup of the yard to the front of the building. The gate and fence section will be required to match the existing palisade gate. Some remedial work is required to the locking bolt of the existing gate to leave it in good working order. The front yard is to be cleaned of all debris and vegetation to leave in a condition suitable for follow on works. This invitation to tender is only applicable to the removal of asbestos, remedial works and general clean up to houses 9 to 11 St Mary’s Terrace and provision of gate and clean up to the Old Council Depot, Loughanaskin, Athlone, County Westmeath as detailed in this scope of works document , shown on the drawings and itemized within the accompanying pricing document.

Westmeath County Council · 278389-2026
EUIreland

Ireland – Suction-sweeper vehicles – Tender for the Supply Delivery and Maintenance of a Road Sweeper at SmartPly Europe DAC 26

SMARTPLY Europe DAC is seeking tender submission for the supply, delivery and full maintenance package of a Road sweeper suitable for the Panel Industry to cater for particularly fine dust and also that can be used for removing various materials including dirt, leaves, litter and debris in all of the following areas : Internally, externally around the site and road, carpark and surrounding area of the plant on its premises in Belview, Slieverue, Waterford. We are looking for a machine that has sustainable options, i.e. HVO or battery operated. The proposed machine must provide sufficient suction capacity and airflow performance to effectively operate within a wood panel processing environment, ensuring efficient extraction and removal of small chips and fine particulate matter. SmartPly are looking for submissions on the following option: relating to a hydrotreated vegetable oil engine (HVO) compatible and or an alternative power source Road Sweeper. A direct purchase of the defined road sweeper for both an HVO compatible engine and or an alternative power source with a full maintenance and routine check package. Please provide details of what’s included and excluded in the maintenance package. Tenderers must provide the following information (but not limited to): • Detailed description of proposed machine to include the manufacturer name, chassis, and full technical specification, • Engine and transmission or other sustainable option details. • Details of safety features, warning systems, impact sensor reports and pedestrian telemetry with real time proximity alerts. • An accurate lead time for delivery of the proposed machine • Warranty details • Details of after sales service offered. Please refer to Award Criteria B4 Capacity to Provide After Sales Service and Warranty. • Environmental Features • An itemised list of recommended spare parts As part of the evaluation process, shortlisted candidates may be required to arrange and conduct an on-site demonstration of the proposed road sweeper. The purpose of this demonstration is to verify that the equipment meets the operational requirements and is fit for its intended purpose under actual working conditions. We currently lease a HAKO CM1650 which meets our needs and therefore we would require candidates to propose a similar or better alternative road sweeper.

SmartPly Europe DAC · 333195-2026
€60K
$65K
EUIreland

Ireland – Road transport services – Provision of Ground Transportation Management for Ireland’s Presidency of the European Union Council 2026 to the Minister for Foreign Affairs and Trade

Ground Transport Management services to coordinate the delivery of ground transport requirements for high-level events taking place in Ireland during the term of Ireland’s Presidency of the Council of the European Union

Department of Foreign Affairs and Trade/An Roinn Gnóthaí Eachtracha agus Trádála · 282316-2026
€5.5M
$5.9M